CNC Pit Setup
OH&S dictates that the CNC Pit needs to remain tidy. For some time there will be weekly inductions ( 5 participants plus facilitator) and open lab access ( min 2 people)
To achieve this we will have a specifc list of furniture and equipment stored there. Anything else needs to be removed be the machine is used.
Tools
- Battery drill and charger
- Phillips head Driver bit
- Drill bits
- Screws and washers ( well labeled so bed is never punched with longer screws )
- Mallet
- Water spray
- Chuck Wrench 1
- Chuck wrench 2
- Tape measure
- Veneer calliper
- Multi Cam Manual
- Tooling/ collets
- Tarp
Stationary
- Markers (sharpie)
- Pencil
- Whiteboard markers
- Biro
- Clipboards x 6
- Broom
Cleaning/Maintenance
- Spray and Wipe
- Supply of Chux
- WD40
- Steel Wool
PPE
- Gloves ( for changing tool and manual handling) x 6 pairs (C)
- Eyes Protection Clean x 6 pairs (C)
- Container Eyes Protection Worn (C)
- Disposable Hearing protection(C)
- Hearing protection (Muff type) (C)
- Dust masks disposable (C)
Furniture
- Whiteboard
- 6x stools
- Bin ( no offcuts )
- Computer bench
- Bookshelves
Signage
(even if these are printouts initially)
- Operator only inside line when machine is cutting
- Line
- Eye and hearing protection to be worn when machine is in operation
- Cut settings
- Right tool for the job
- *(C)** A Stock of accountable consumables will be kept in the consumables store and will be stocktaked weekly.
- See Stock Control for procedures around these items.