Daily Setup

~~REVEAL~~

Daily Setup

Prepare Space

20160922_103719.jpg

  • Sign out Pit Key
  • Establish Comms via walkie talkie (Channel 21)
  • Open Roller Door
  • Place bollards out for CNC work area
  • Check dust extractor bag /Empty if required

Prepare Space Continued

  • Turn on compressor
  • Ensure required PPE is available and that the space is tidy enough to commence work.
  • Remove MDF cover board from waste board.(2 person lift recommended)
  • Check the condition of waste board for high spots and lightly sand where necessary
  • Turn on the CAD Computer, digital signage, lights and fan where necessary

Setup Machine

  • If there is a cutting tool/bit on the machine - ensure it is secure.
  • Ensure Spindle is clear for warmup procedure.
  • Test Vacuum Bed Compressor
  • Test Dust Extractor

Setup Machine Continued

  • Turn on CNC machine and wait for it so go through its start up procedure
  • Home the machine
  • select Warm up spindle and OK (5 Mins)

facilities/fablab/equipment-cots/multicam_m-2412/daily_machine_setup.txt · Last modified: 2018/07/23 14:27 by Michael Byrne
CC Attribution-Share Alike 4.0 International Except where otherwise noted, content on this wiki is licensed under the following license: CC Attribution-Share Alike 4.0 International

We acknowledge Aboriginal and Torres Strait Islander peoples and their continuing connection to land and as custodians of stories for millennia. We are inspired by this tradition in our work to share and preserve Queensland's memory for future generations.