Men's Sheds Session 3

9.30-11.30 (and onwards if the group feels)

The wider GGR program at this time is about designing and making a sign. The group that is coming have expressed that they are keen to get involved in making and one member would like to finish the CCC program. https://ccclabs.edgeqld.org.au/doku.php

Mick will work with group to begin to build the false wall for the large scale sign to go on. There is also the large Kaiju that has been installed this week that requires minor scale repairs.

See here for more about that: Making a Kaiju

Andrei will (hopefully) finalize the CCC program with the member. This way they can begin to implement it back at their Shed.

Preparation

Prepare materials needed for the false wall

Prepare for CCC (space and computer)

Make cups of tea or coffee if needed.

engagement/the_great_and_grand_rumpus/session_3.txt · Last modified: 2021/05/27 12:43 by pmusk
CC Attribution-Share Alike 4.0 International Except where otherwise noted, content on this wiki is licensed under the following license: CC Attribution-Share Alike 4.0 International

We acknowledge Aboriginal and Torres Strait Islander peoples and their continuing connection to land and as custodians of stories for millennia. We are inspired by this tradition in our work to share and preserve Queensland's memory for future generations.