Here is where both departments collaborated and considered the technical requirements and limitations for the project.

It was broken up into the following categories:

1. A tech audit (of what resources we actually had available)

2. tech audit and allocations across the space

3. Digital content audit.

https://docs.google.com/spreadsheets/d/1zCfzwvg3ZvbqCTfnw4w4cpBt5mSEnFpArvdBn1tbN7s/edit#gid=511991543