~~REVEAL~~ ====== Daily Setup ====== ==== Prepare Space ==== {{ :mobileupload:mick:20160922:20160922_103719.jpg?300 |20160922_103719.jpg}} * Sign out Pit Key * Establish Comms via walkie talkie (Channel 21) * Open Roller Door * Place bollards out for CNC work area * Check dust extractor bag /Empty if required ==== Prepare Space Continued==== * Turn on compressor * Ensure required PPE is available and that the space is tidy enough to commence work. * Remove MDF cover board from waste board.**(2 person lift recommended)** * Check the condition of waste board for high spots and lightly sand where necessary * Turn on the CAD Computer, digital signage, lights and fan where necessary ==== Setup Machine ==== * If there is a cutting tool/bit on the machine - ensure it is secure. * Ensure Spindle is clear for warmup procedure. * Test Vacuum Bed Compressor * Test Dust Extractor ==== Setup Machine Continued==== * Turn on CNC machine and wait for it so go through its start up procedure * Home the machine * select Warm up spindle and OK (5 Mins) ----