===== CNC Pit Setup ===== OH&S dictates that the CNC Pit needs to remain tidy. For some time there will be weekly inductions ( 5 participants plus facilitator) and open lab access ( min 2 people) To achieve this we will have a specifc list of furniture and equipment stored there. Anything else needs to be removed be the machine is used. ====Tools==== * Battery drill and charger * Phillips head Driver bit * Drill bits * Screws and washers ( well labeled so bed is never punched with longer screws ) * Mallet * Water spray * Chuck Wrench 1 * Chuck wrench 2 * Tape measure * Veneer calliper * Multi Cam Manual * Tooling/ collets * Tarp ====Stationary==== * Markers (sharpie) * Pencil * Whiteboard markers * Biro * Clipboards x 6 * Broom ====Cleaning/Maintenance==== * Spray and Wipe * Supply of Chux * WD40 * Steel Wool ====PPE==== * Gloves ( for changing tool and manual handling) x 6 pairs (C) * Eyes Protection **Clean** x 6 pairs (C) * Container Eyes Protection **Worn** (C) * Disposable Hearing protection(C) * Hearing protection (Muff type) (C) * Dust masks disposable (C) ====Furniture==== * Whiteboard * 6x stools * Bin ( no offcuts ) * Computer bench * Bookshelves ====Signage==== (even if these are printouts initially) * Operator only inside line when machine is cutting * Line * Eye and hearing protection to be worn when machine is in operation * Cut settings * Right tool for the job **(C)** A Stock of accountable consumables will be kept in the consumables store and will be stocktaked weekly. *See Stock Control for procedures around these items.